PROJECT
Nam Ngum Hydropower Station Restoration, Stage II

CLIENT
B/S : Japan International Cooperation Agency (JICA) D/D, C/S : L'Electricité du Laos (EDL)

Industrial park sez icon white
SECTOR
Industrial Park
Calendar icon white
PROJECT PERIOD
November 1980 - March 1992
PROJECT OVERVIEW

The project was aimed to restore the generating equipment and all related facilities.


The Stage-I restoration (15 MW/unit) was completed in March 1982 while the basic study and design for Stage-II (40 MW/unit) restoration was completed in May 1989. 


The Stage-II restoration works commenced with the detailed design and supervisory services for No.3 generating unit in July 1989. 


The project was completed in March 1992.


FEATURES
- Stage-I for No.1 and No.2 generating units (15 MW/unit)
- Stage-II for No.3 and No.4 generating units (40 MW/unit)
SERVICES

- Basic Study and Design

- Detailed Design

- Supervision for the Stage I and II Restoration Works